For all reasons stated herein the motion of plaintiff Irene B. Kopel, as trustee of the Irene B. Kopel 1993 Trust u/d/t dated November 23, 1993, for leave to file amendment to first amended complaint is granted. Plaintiff is granted leave to file and serve a second amended complaint on or before November 2, 2026. On or before December 2, 2026, defendants shall file and serve a responsive pleading to the second amended complaint. The trial date of January 8, 2027, is vacated. The parties shall appear and be prepared to discuss a new trial date and related dates.
Background:
On April 28, 2025, plaintiff Irene B. Kopel (Kopel), as trustee of the Irene B. Kopel 1993 Trust u/d/t dated November 23, 1993 (Kopel Trust), filed the original complaint in this construction defect action against defendant Lynch Construction, Inc. (Lynch).
On June 30, 2025, Lynch filed its answer to the complaint, generally denying the allegations thereof and asserting 38 affirmative defenses. Lynch concurrently filed a cross-complaint (Lynch CC) for indemnity and negligence against cross-defendants Southwest Door & Window of California, Inc. (Southwest Door), Lewis Plumbing Inc. (Lewis Plumbing), Anguiano Bros. Corporation (Anguiano Bros), Pat Thomas Drywall (Thomas Drywall), Quality Plastering, Inc (Quality Plastering), Ironcad Ltd. (Ironcad), Ilenstine Tile, Inc. (Ilenstine Tile), Custom Paver Pros Inc. (Custom Paver), Santa Barbara Surfacing, Inc. (SB Surfacing), and Besand Group (Besand).
On August 15, 2025, Ironcad filed its answer to the Lynch CC, generally denying the allegations thereof and asserting 26 affirmative defenses.
On August 27, 2025, the court designated this matter as complex.
On September 10, 2025, Besand filed its answer to the Lynch CC, generally denying the allegations thereof and asserting 21 affirmative defenses. Besand concurrently filed a cross-complaint against fictitiously named cross-defendants for indemnity.
On September 17, 2025, Quality Plastering filed its answer the Lynch CC, generally denying the allegations thereof and asserting 30 affirmative defenses.
On September 19, 2025, Anguiano Bros filed its answer the Lynch CC, generally denying the allegations thereof and asserting 25 affirmative defenses.
On September 24, 2025, Ilenstine Tile filed its answer the Lynch CC, generally denying the allegations thereof and asserting 19 affirmative defenses.
On October 7, 2025, Thomas Drywall filed its answer the Lynch CC, generally denying the allegations thereof and asserting 37 affirmative defenses.
On October 10, 2025, SB Surfacing filed its answer to the Lynch CC, generally denying the allegations thereof and asserting 39 affirmative defenses.
On October 13, 2025, SB Surfacing filed a cross-complaint against fictitiously-named cross-defendants for indemnity.
On October 21, 2025, Lewis Plumbing filed its answer to the Lynch CC, generally denying the allegations thereof and asserting 15 affirmative defenses.
On December 15, 2025, the court entered a stipulated joint complex case management order appointing David Schlueter as discovery referee.
On January 12, 2026, Lynch filed an amendment to the Lynch CC identifying as fictious defendants Roe 1 through 7 as, respectively, Challenge Asphalt, Inc. (Challenge Asphalt), Custom Hardscapes, Inc. (Custom Hardscapes), Jon Rose Construction, Inc. (Rose Construction), Lazcano Masonry & Concrete, Inc. (Lazcano Masonry), Loewen, Pacific Stoneworks, Inc. (Pacific Stoneworks), and Pappa’s Plastering & Drywall, Inc. (Pappa’s Plastering).
On April 7, 2026, Kopel filed three “Doe” amendments to the complaint, identifying Anguiano Bros, Custom Hardscapes, and Quality Plastering as Does 1 through 3, respectively.
On April 13, 2026, Custom Hardscapes filed its answer to the Lynch CC, generally denying the allegations thereof and asserting 19 affirmative defenses. Custom Hardscapes concurrently filed a cross-complaint (Custom Hardscapes CC) for indemnity against Lynch, Quality Plastering, Anguiano Bros, Southwest Door, Ironcad, Thomas Drywall, Ilenstine Tile, Lewis Plumbing, SB Surfacing, Besand, Harrison Design California, Inc. d/b/a/ Harrison Design Associates (Harrison Design).
On April 21, 2026, Anguiano Bros filed its answer to the complaint, generally denying the allegations thereof and asserting 19 affirmative defenses.
On April 29, 2026, Kopel filed a motion for leave to file a first amended complaint to add specific charging allegations against five Doe defendants and to add and clarify factual allegations regarding the construction defects. Also on April 29, Kopel filed two “Doe” amendments to the complaint identifying Rose Construction and Lazcano Masonry as Does 4 and 5, respectively.
On May 1, 2026, Quality Plastering filed its answer to the Custom Hardscapes CC, generally denying the allegations thereof and asserting 17 affirmative defenses.
On May 11, 2026, Custom Hardscapes filed its answer the complaint, generally denying the allegations thereof and asserting 13 affirmative defenses.
Also on May 11, Quality Plastering filed its answer to the complaint, generally denying the allegations thereof and asserting 27 affirmative defenses. Quality Plastering concurrently filed a cross-complaint (Quality Plastering CC) against Anguiano Bros, Ironcad, Ilenstine Tile, and SB Surfacing.
Also on May 11, Lynch Construction requested, and the court entered, default on the Lynch CC as to Rose Construction, Lazcano Masonry, and Pappa’s Plastering & Drywall, Inc. (Pappa’s Plastering).
On May 12, 2026, Lynch filed its answer to the Custom Hardscapes CC, generally denying the allegations thereof and asserting 37 affirmative defenses.
Also on May 12, SB Surfacing filed its answer to the Custom Hardscapes CC, generally denying the allegations thereof and asserting 39 affirmative defenses.
On May 18, 2026, SB Surfacing filed its answer to the Quality Plastering CC, generally denying the allegations thereof and asserting 39 affirmative defenses.
On May 19, 2026, Kopel filed a fictitious party amendment to the complaint identifying SB Surfacing as Doe 7.
On May 26, 2026, Lynch filed a fictitious party amendment to the Lynch CC identifying Douglas Hardwood Floors, Inc. (Douglas Hardwood), as Roe 8 and M C Electric Company (MC Electric) as Roe 9.
On May 27, 2026, Kopel filed a first amended complaint (FAC). The FAC states two causes of action for: (1) negligence against Lynch, Anguiano Bros, Custom Hardscapes, Quality Plastering, Rose Construction, Lazcano Masonry; and (2) breach of implied warranty against Lynch.
As alleged in the FAC:
Kopel resides in real property at 913 Park Lane, Montecito (Property). (FAC, ¶ 3.) The Kopel Trust owns a 15 percent tenant-in-common interest in the Property. (FAC, ¶ 1.) Kopel is trustee of the Kopel Trust. (FAC, p. 1, ll. 19-20.) The Chao Family 2012 Irrevocable Trust u/t/a dated April 11, 2012 (Chao Trust), owns the majority 85 percent interest. (Ibid.) Natasha G. Chao (Natasha) is trustee of the Chao Trust.
The Kopel Trust and Chao Trust purchased the Property on April 12, 2012. (FAC, ¶ 2.) Alfred Chao (Alfred) is married to Kopel and is the settlor of the Chao Trust. (FAC, ¶ 4.) Alfred resides at the Property from time-to-time. (Ibid.) Natasha is the daughter of Alfred and Kopel. (FAC, ¶ 5.)
In March 2013, Kopel and Alfred hired Lynch to act as general contractor for a remodeling project (Project) at the Property. (FAC, ¶ 10.) A written contract was circulated but not executed. (Ibid.) The parties nonetheless entered into an agreement for construction services (Agreement). (Ibid.)
Per the Agreement, Lynch agreed to furnish all labor, materials, equipment, and services, including all coordination and supervision necessary to complete various remodeling improvements at the Property. (FAC, ¶ 11.) This included demolition, installation of stone cladding and stucco, doors, windows, and other interior and exterior work. (Ibid.) The agreed scope of the work was defined by the plans and specifications prepared by Kopel’s architect, Harrison Design California, Inc. dba Harrison Design Associates (the Plans). (Ibid.)
In consideration for performance of the work, Kopel agreed to pay Lynch the reasonable cost of the work, including the cost of all materials, equipment, services, and labor reasonably necessary to complete the Project in a good and workmanlike manner. (FAC, ¶ 11.) This included critical exterior envelope systems, including stucco cladding, adhered stone veneer, roofing systems, waterproofing assemblies, flashing, and integration of all components forming the weather-resistant barrier of the structure. (Ibid.)
Lynch subcontracted portions of its obligations under the Agreement to third parties (Subcontractors) while retaining responsibility for the overall project management, supervision, and quality of the work, including the proper sequencing and integration of waterproofing, flashing, and drainage systems across trades. (FAC, ¶ 12.)
Lynch failed to ensure that the Subcontractors performed their work in a proper and workmanlike manner in compliance with the Agreement and Plans. (FAC, ¶ 12.) These failures resulted in numerous construction defects and delays. (Ibid.)
Substantial completion of the Project occurred in June 2017. (FAC, ¶ 15.) After moving in, Kopel began noticing construction issues including issues with stucco, leaking windows, . (FAC, ¶¶ 16-21.) Lynch acknowledged these issues, and was cooperative in promptly responding and undertaking repairs. (FAC, ¶ 16.) Over time, additional construction issues surfaced, and issues Kopel had been told had been repaired, reappeared. (FAC, ¶ 17.) Lynch was notified, acknowledged the issues, promised repairs, and undertook repairs. (FAC, ¶ 16.)
The work by Lynch and its Subcontractors was defective, resulting in repeated failed repairs, numerous leaks, and other construction-related failures. (FAC, ¶ 23.) These failures are not isolated, but reflect systemic defects in the exterior building envelope, including the absence of a functional drainage plane, improper integration of weather-resistant barriers, and reverse laps allowing water intrusion into wall, deck, and structural assemblies. (Ibid.)
The FAC prays for monetary damages exceeding $4 million.
On May 28, 2026, Lynch filed a file a first amended cross-complaint (Lynch FACC) adding two cross-defendants, Harison and Anthony Grumbine (Grumbine), and a cause of action for professional negligence against these two cross-defendants. The named cross-defendants in the FACC are Harison, Grumbine, Southwest Door, Lewis Plumbing, Anguiano Bros, Thomas Drywall, Quality Plastering, Ironcad, Ilenstine Tile, Custom Paver, SB Surfacing, and Besand.
On June 5, 2026, the default entered against Pappa’s Plastering as to the Lynch CC was set aside by stipulation.
Also on June 5, SB Surfacing filed an answer to the FAC, generally denying the allegations therein and setting forth 43 affirmative defenses.
On June 8, 2026, Pappa’s Plastering filed an answer to the Lynch CC, generally denying the allegations therein and setting forth 44 affirmative defenses.
On June 9, 2026, Ilenstine Tile filed an answer to the Quality Plastering CC, generally denying the allegations therein and setting forth 32 affirmative defenses.
On June 10, 2026, Custom Hardscapes filed a request for dismissal of Thomas Drywall as to the Custom Hardscapes CC, which was entered that same day.
On June 12, 2026, Thomas Drywall filed an answer to the Lynch FACC, generally denying the allegations therein and setting forth 37 affirmative defenses.
On June 23, 2026, Lynch filed a request for dismissal of Pappa’s Plastering as to the Lynch CC, which was entered that same day.
On June 24, 2026, Lynch filed a request for dismissal of Besand as to the Lynch CC, which was entered that same day.
On June 26, 2026, Ilenstine Tile filed an answer to the Lynch FACC, generally denying the allegations therein and setting forth 31 affirmative defenses.
On June 29, 2026, Quality Plastering filed an answer to the FAC, generally denying the allegations therein and setting forth 27 affirmative defenses.
On June 30, 2026, Custom Hardscapes filed an answer to the FAC, generally denying the allegations therein and setting forth 56 affirmative defenses. Also June 30, Custom Hardscapes filed an answer to the Lynch FACC, generally denying the allegations therein and setting forth 57 affirmative defenses.
On July 2, 2026, Anguiano Bros filed an answer to the FAC, generally denying the allegations therein and setting forth 19 affirmative defenses.
Also on July 2, Ironcad filed an answer to the Quality Plastering CC, generally denying the allegations therein and setting forth 26 affirmative defenses.
On July 8, 2026, Custom Hardscapes filed a request for dismissal of Besand as to the Custom Hardscapes CC, which was entered that same day.
On July 13, 2026, Rose Construction filed an answer to the FAC, generally denying the allegations therein and setting forth 31 affirmative defenses.
July 14, 2026, Besand filed a request for dismissal of the cross-complaint it filed on September 10, 2025, which was entered that same day.
On July 15, 2026, Anguiano Bros filed an answer to the Quality Plastering CC, generally denying the allegations therein and setting forth 25 affirmative defenses.
On July 22, 2026, the default entered against Rose Construction as to the Lynch CC was set aside by stipulated order.
Also on July 22, Douglas Hardwood filed an answer to the Lynch FACC, generally denying the allegations therein and setting forth 22 affirmative defenses.
On July 24, 2026, Ilenstine Tile filed an answer to the FAC, generally denying the allegations therein and setting forth 31 affirmative defenses.
On July 30, 2026, Rose Construction filed an answer to the Lynch FACC, generally denying the allegations therein and setting forth 44 affirmative defenses.
On August 13, 2026, Lynch filed a request for dismissal of Custom Paver as to the Lynch FACC, which was entered that same day.
On August 21 and September 2, 2026, Lynch dismissed several cross-defendants as to the Lynch FACC including Loewen, Pacific Stoneworks, Southwest Door, Challenge Asphalt, and Lewis Plumbing.
On September 14, 2026, the discovery referee’s recommendation as to case scheduling deadlines was approved and entered by the court.
On August 25, 2026, Lynch filed an answer to the FAC, generally denying the allegations therein and setting forth 34 affirmative defenses.
This hearing pertains to Kopel’s motion for leave to file an amendment to the FAC that adds Natasha as trustee of the Chao Trust as an additional plaintiff as to all claims in the FAC. This motion is opposed by Lynch, Harrison, and SB Surfacing.
Analysis:
“The court may, in furtherance of justice, and on any terms as may be proper, allow a party to amend any pleading ….” (Code Civ. Proc., § 473, subd. (a)(1).) “However, the court’s discretion will usually be exercised liberally to permit amendment of the pleadings. [Citations.] The policy favoring amendment is so strong that it is a rare case in which denial of leave to amend can be justified.” (Howard v. County of San Diego (2010) 184 Cal.App.4th 1422, 1428.) “Statutes like section 473 are ‘construed liberally so that cases might be tried upon their merits in one trial where no prejudice to the opposing party ... is demonstrated.’ [Citation.] Further, this liberal policy applies to amendments ‘at any stage of the proceedings, up to and including trial,’ absent prejudice to the adverse party. [Citation.]” (Tung v. Chicago Title Co. (2021) 63 Cal.App.5th 734, 747, some internal quotation marks omitted.) “However, ‘even if a good amendment is proposed in proper form, unwarranted delay in presenting it may—of itself—be a valid reason for denial.’ ” (Huff v. Wilkins (2006) 138 Cal.App.4th 732, 746, some internal quotation marks omitted.)
“A motion to amend a pleading before trial must: [¶] (1) Include a copy of the proposed amendment or amended pleading, which must be serially numbered to differentiate it from previous pleadings or amendments; [¶] (2) State what allegations in the previous pleading are proposed to be deleted, if any, and where, by page, paragraph, and line number, the deleted allegations are located; and [¶]
(3) State what allegations are proposed to be added to the previous pleading, if any, and where, by page, paragraph, and line number, the additional allegations are located.” (Cal. Rules of Court, rule 3.1324(a).)
“A separate declaration must accompany the motion and must specify: [¶]
(1) The effect of the amendment; [¶] (2) Why the amendment is necessary and proper; [¶] (3) When the facts giving rise to the amended allegations were discovered; and [¶] (4) The reasons why the request for amendment was not made earlier.” (Cal. Rules of Court, rule 3.1324(b).)
“The court may deem a motion to file an amendment to a pleading to be a motion to file an amended pleading and require the filing of the entire previous pleading with the approved amendments incorporated into it.” (Cal. Rules of Court, rule 3.1324(c).) “If the complaint is amended, a copy of the amendments shall be filed, or the court may, in its discretion, require the complaint as amended to be filed ….” (Code Civ. Proc., § 471.5, subd. (a).)
Here, as alleged in the operative FAC, the Kopel Trust owns a 15 percent tenant-in-common interest in the Property and the Chao Trust owns the majority 85 percent interest. (FAC, ¶¶ 1-3.) The proposed amendment changes the defined term, “Plaintiff,” currently defined in the FAC as the Kopel Trust, to include both the Kopel Trust and the Chao Trust. (Motion, Ex. A.)
Several defendants oppose the proposed amendments on the grounds that Kopel has known about and alleged the 15/85 split in ownership between the Kopel Trust and the Chao Trust since the outset of this lawsuit. Defendants argue that Kopel made the strategic decision to not include Natasha, as trustee of the Chao Trust, as a plaintiff in this action. As argued by defendants, to insert this new plaintiff now, right before trial, would cause unfair prejudice to defendants. Defendants argue that the proposed amendments greatly expand the liability at issue. Moreover, as argued by defendants, virtually all of the trial preparation has occurred on the assumption that Kopel as trustee of the Kopel Trust is the only plaintiff in this action. Defendants argue that permitting such an amendment now would not provide defendants a fair opportunity to defend themselves. Lynch argues in the alternative that if the proposed amendments are permitted, the current trial, discovery, and pre-trial dates should be changed to a later date to avoid unfair prejudice.
Kopel argues that the damages at issue in this action are to the Property itself and the scope of issues is the same whether or not the Chao Trust is added as a plaintiff. Kopel argues that defendants have known about the proposed amendments since June 2026 and there is no unfair surprise. Kopel argues that 100 percent of the damages to the Property are already at issue in this action and adding the Chao Trust does not expand liability. Kopel argues that the amendments only recently became necessary when defendants raised issues pertaining to percentage of control or ownership of the Property during mediation discussions. Kopel does not agree with these arguments, but seeks these amendments out of an abundance of caution. Kopel argues that the amendments are more akin to a technicality and merely assure that complete resolution of the dispute can be accomplished by this action.
The court has reviewed the arguments by the parties and the legal standard of review. The court must grant permission to amend pleadings with great liberality in the absence of prejudice to any opposing party. Based on these standards, the court will grant Kopel’s motion for leave to amend but also grant Lynch’s request for a trial continuance. The court determines that a trial continuance will sufficiently address any prejudice raised by defendants.
The court will require the filing and service of a second amended complaint. Defendants will have an opportunity to file a responsive pleading and raise any defenses. The court will entertain argument as to additional time for discovery that may be necessary as to any new claims or defenses presented by the proposed amendments. The parties shall appear and be prepared to discuss trial scheduling issues including a new trial date, pre-trial dates, and any necessary additional discovery pertaining to any new claims or defenses.